{"id":6576,"date":"2025-05-26T10:30:17","date_gmt":"2025-05-26T10:30:17","guid":{"rendered":"https:\/\/beadysword.com.ng\/blog\/?p=6576"},"modified":"2025-05-26T10:30:29","modified_gmt":"2025-05-26T10:30:29","slug":"2000mw-electricity-generation-capacity-stranded-due-to-n600bn-debt-ndphc","status":"publish","type":"post","link":"https:\/\/beadysword.com.ng\/blog\/2025\/05\/26\/2000mw-electricity-generation-capacity-stranded-due-to-n600bn-debt-ndphc\/","title":{"rendered":"2,000MW Electricity Generation Capacity Stranded Due To N600bn Debt \u2013 NDPHC"},"content":{"rendered":"<div id=\"mvp-site\" class=\"left relative\">\n<div id=\"mvp-site-wall\" class=\"left relative\">\n<div id=\"mvp-site-main\" class=\"left relative\">\n<div id=\"mvp-main-body-wrap\" class=\"left relative\">\n<article id=\"mvp-article-wrap\">\n<div id=\"mvp-article-cont\" class=\"left relative\">\n<div class=\"mvp-main-box\">\n<div id=\"mvp-post-main\" class=\"left relative\">\n<div class=\"mvp-post-main-out left relative\">\n<div class=\"mvp-post-main-in\">\n<div id=\"mvp-post-content\" class=\"left relative\">\n<div id=\"mvp-content-wrap\" class=\"left relative\">\n<div class=\"mvp-post-soc-out right relative\">\n<div class=\"mvp-post-soc-in\">\n<div id=\"mvp-content-body\" class=\"left relative\">\n<div id=\"mvp-content-body-top\" class=\"left relative\">\n<div id=\"mvp-content-main\" class=\"left relative\">\n<p>The management of Niger Delta Power Holding Company has lamented that its 2,000-megawatt electricity generation capacity is stranded due to N600 billion in gas debts and other constraints.<\/p>\n<p>The Managing Director of NDPHC, Jennifer Adighije, disclosed this in a statement to DAILY POST by her Technical Adviser on Media, Adesanya Adejokun.<\/p>\n<p>It stressed that the country\u2019s Integrated Power Project plants managed by NDPHC faced setbacks due to inadequate monetisation.<\/p>\n<div class=\"code-block code-block-24\">\n<div align=\"center\">\n<div id=\"div-gpt-ad-1574186166799-0\" data-google-query-id=\"CLmYorz2wI0DFde_JwIdo0AFlg\">\n<div id=\"google_ads_iframe_\/14001636\/DP_InsidePost_MPU_6_0__container__\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>According to her, despite the challenges, NDPHC has worked tirelessly to rehabilitate five turbine units across Calabar, Omotosho, Sapele, and Ihovbor power plants that were erstwhile offline.<\/p>\n<p>She noted that the plants now contribute an additional 625 megawatts to the national grid.<\/p>\n<p>\u201cSupply challenges, transmission constraints, as well as close to N600bn debt being owed the company by Nigeria Bulk Electricity Trading and other bilateral entities, are hindering the company\u2019s operations.<\/p>\n<p>\u201cNDPHC currently has a mechanically available generation capacity of about 2,000 MW that is significantly stranded due to transmission constraints, gas supply, and gas transportation limitations in addition to dwindling offtake by the distribution companies,\u201d she stated.<\/p>\n<div class=\"heateorSssClear\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The management of Niger Delta Power Holding Company has lamented that its 2,000-megawatt electricity generation capacity is stranded due to N600 billion in gas debts and other constraints. The Managing Director of NDPHC, Jennifer&#46;&#46;&#46;<\/p>\n","protected":false},"author":2,"featured_media":6577,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-6576","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/beadysword.com.ng\/blog\/wp-json\/wp\/v2\/posts\/6576","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/beadysword.com.ng\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/beadysword.com.ng\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/beadysword.com.ng\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/beadysword.com.ng\/blog\/wp-json\/wp\/v2\/comments?post=6576"}],"version-history":[{"count":1,"href":"https:\/\/beadysword.com.ng\/blog\/wp-json\/wp\/v2\/posts\/6576\/revisions"}],"predecessor-version":[{"id":6578,"href":"https:\/\/beadysword.com.ng\/blog\/wp-json\/wp\/v2\/posts\/6576\/revisions\/6578"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/beadysword.com.ng\/blog\/wp-json\/wp\/v2\/media\/6577"}],"wp:attachment":[{"href":"https:\/\/beadysword.com.ng\/blog\/wp-json\/wp\/v2\/media?parent=6576"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/beadysword.com.ng\/blog\/wp-json\/wp\/v2\/categories?post=6576"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/beadysword.com.ng\/blog\/wp-json\/wp\/v2\/tags?post=6576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}